Posted 2024-12-09 00:00:00 +0000 UTC
Nowadays, electric vehicles are becoming more and more popular. However, due to the lack of them, many people who want to buy electric vehicles are deterred This situation can be improved soon. Recently, the first large-scale centralized public (charging station of Houjie Exhibition Center) in Dongguan Houjie was put into operation. The first large-scale centralized public charging station in Houjie has been put into use in the public's impression. Generally, the electric vehicle charging station is only equipped with more than ten charging piles, and the charging station with better conditions will be equipped with a canopy, with few other facilities. The new charging station of Houjie Convention and Exhibition Center put into use yesterday is very "different", which can realize the simultaneous "charging" of people and vehicles. "This large centralized public charging station can basically meet the one-stop service needs of car owners." According to Jiang Shuai, a staff member of the station, the charging station of Houjie Convention and Exhibition Center is composed of charging area and driver's lounge. Among them, there are 22 charging piles and 44 parking spaces in the charging area, equipped with two 80kW, 12 120kw and 30 160kW fast charging guns, which can meet the charging requirements of all types of electric vehicles. The charging standard varies according to the time period. It is 0.75 yuan / degree at 8:00-9:00, 12:00-19:00, 22:00-24:00, 0.48 yuan / degree at 0:00-8:00, and 1.13 yuan / degree at the remaining time period. In addition, the service fee is 0.1 yuan / degree (before the end of this month). Take a new energy network car with five seats and a capacity of 60 degrees as an example. Using a fast charging gun with a power of 160 kilowatts, it only takes 40 minutes from zero to full charge, and it costs 73.8 yuan to charge from 9:00 to 12:00. Compared with other charging stations, the biggest difference of the charging station of Houjie Convention and Exhibition Center is that it is equipped with a rest room with an area of more than 200 square meters, which is equipped with public toilets, bathrooms, air conditioners, massage chairs, automatic vending machines, WiFi, etc. The rest room is mainly used by drivers. When tired, drivers can take a hot bath in the station. When sleepy, they can rest in a massage chair. When hungry, they can also use free WiFi to order food. "Take a nap and 'recharge' yourself. When the vehicle is fully charged, the driver can keep on going in full swing to ensure driving safety." Jiang Shuai said. Fast charging has always been the "heart matter" of new energy vehicle drivers. Mr. Chen, who has been driving a taxi for about 10 years, said that he started driving a new energy taxi last year. There is no noise in the new car, and the passenger experience is relatively comfortable. Compared with the oil car, he can save more than 100 yuan of fuel fee every day, but the most headache is the inconvenience of charging. "Last year, I took a passenger to Huizhou and found a slow charging pile in a shopping mall, but it affected my business for too long. Now in this fast charging station, one full charge, one day's operation will be guaranteed. " According to the overall planning and deployment of Houjie power supply sub Bureau, in 2019, Houjie power supply sub bureau plans to build a batch of new charging facilities in Houjie Town, including one new main body of electric house, six power supply transformers and 48 charging piles, which are respectively gymnasium charging station, cultural park charging station, shenxianshui Park charging station, Fengshan Park charging station, sports park charging station and Xitou community parking lot charging station Station. One of the fastest growing is the Cultural Park charging station. The station has 1 power supply transformer and 18 charging piles, which will be integrated with Houjie culture and other elements. At present, the infrastructure construction of the Cultural Park charging station has been basically completed, the installation of the canopy has been completed, the high-voltage transformer has been powered on at the end of 10, the charging pile facilities are being installed and commissioned, and it is planned to be powered on at the end of 11. The person in charge of Houjie power supply branch said that the construction of charging station is to respond to the national energy conservation and emission reduction policies, accelerate the popularization and utilization of new energy vehicles, effectively promote the substitution of electric energy for traditional fuel oil, reduce vehicle exhaust emissions, prevent and control air pollution, and help Houjie ecological civilization construction.
Copyright © 2020. TUTESL All rights reserved.